All cellular tower equipment requires a permit except for minor repairs to existing approved equipment.

APPLICATION REQUIREMENTS

All applications need to be submitted online at this time 

PERMIT APPLICATION must include the following attachments:

  • Signed Contract 
  • Plans and Specifications
  • Plat of Survey

REGISTRATION REQUIREMENTS

Contractors need to be registered with the City of Waukegan CONTRACTOR REGISTRATION APPLICATION. The following items are required with your registration:             

  • COI (Certificate of Insurance) includes; comprehensive liability general aggregate $2,000,000, proof of workers compensation, CITY OF WAUKEGAN, AS ADDITIONAL INSURED
  • $10,000 License and Permit Bond
  • Copy of Illinois Electrical Municipal License
  • $100.00 Annual Registration Fee

INSPECTION REQUIREMENTS

  1. None

PERMIT FEES

Permit pricing is calculated based on the amount of the contract, minimum of $125.00 for construction value under $3,000.00 OR a $150.00 base + 3% of value over $3,001.00. Electrical Plan Review Fees from a flat fee of $75.00 up to 1.5% of the construction value will be assessed. Planning and Zoning Fee of $150.00 per submittal. A $75.00 charge will be assessed for failed and no show inspections. Permit Fees will be doubled for any work started without an official permit posted.

ADDITIONAL REQUIREMENTS

DIGITAL PERMIT COPIES MUST BE MADE AVAILABLE UPON REQUEST WHILE WORK IS BEING COMPLETED